Popular Posts

Thursday, June 26, 2008

Bridge Over Troubled Water

At 2:45 PM the Draw Bridge in Downtown Salisbury is up once again. Thank God the UPS Delivery Man wasn't delivering his packages at this very moment, eh?

7 comments:

  1. thats at least the second time today, it was up this morning too

    ReplyDelete
  2. So, what is your point? The bridge goes up, the bridge goes down.

    ReplyDelete
  3. Knowing those UPS guys, chances are he would have just jumped in and swam across, feces and all. Those guys are hardcore dedicated!

    ReplyDelete
  4. Point is when they built the firehouse on the bog they said the bridge being up was not a problem as it is hardly ever up. This time of year, there are not many days go by that the bridge isn't up.

    ReplyDelete
  5. So when it was up and they were on Division Street, it was no big deal? I guess the Westside folk weren't/aren't really that important, EH?

    ReplyDelete
  6. Thats UPS for ya. What can brown do for you? Or should it be what can brown do to the Wicomico?

    ReplyDelete
  7. Anon, 9:53PM
    You are absolutly correct. Now there is fire protection on both sides of the bridge. Stations 1 & 2can cover the east side if necessary & station 16 can cover the west side.

    But this was not JA idea, so it isn't a good idea!

    ReplyDelete

Note: Only a member of this blog may post a comment.